Load test
Program:
A load test program
was developed using 6 different full size DTs (10DT24 by 60’-0”). Each
Tee was loaded in 4 load stages in order to evaluate the performance of
the different dap configurations (6”, 8”, 10”, 12”). Each load stage
simulated a specific load condition:
Phase 1, simulates
service load for a parking garage floor level load (LL).
Phase 2, simulates
service load for an office building floor load.
Phase 3, simulates
service load for a parking garage roof level load (LL+Snow).
Phase 4, is the
design strength of the DT used for this test.
facts.
Daps performed as
expected.
Implementation:
December 2004.
|